Bid 25: Res. PB Sample for report
Bid Items Ord. Qty by Loc/Assembly Report
Item
Code
Description
Unit
Quantity
Total
Cost
Order Qty.
Cost Type
Description
Unit
Raw
Unit Cost
Loc. 6: CONCRETE‑FOUNDATION
Assembly  11: Foundatin
 3.001300
15X18 Footing
250.00
LF
CY
HR
469.00
6.25
Material
Labor
55.000
20.000
27,775.65
 3.002500
Conc Slab 4''
1,500.00
SF
CY
HR
19.00
30.00
Material
Labor
55.000
20.000
1,958.15
 3.003000
Fill Dirt Below Slab Sub
15.00
CF
CY
HR
1.00
15.00
Material
Labor
15.000
10.000
226.05
 3.003500
Concrete Steps   Sub‑Bid
35.00
LF
LF
HR
35.00
35.00
Material
Labor
10.000
20.000
1,354.50
 3.004800
Sand & Wire      Sub‑Bid
2.00
SF
HR
SF
2.00
2.00
Labor
Subcontract
20.000
0.350
56.74
 3.030100
6X6 10/10 Wire Mesh
5.00
SF
HR
RL
5.00
1.00
Labor
Subcontract
20.000
54.000
196.70
 3.031100
# 3 (3)Per Run‑Rebar
150.00
LF
PC
HR
26.00
3.00
Material
Labor
0.566
20.000
99.75
38,317.74
Assembly 11: Foundatin =
38,317.74
Loc. 6: CONCRETE‑FOUNDATION
Loc. 15: PLASTERING
Assembly  136: Finishes
 9.000300
Stucco Std.Fin. 9'High
250.00
LF
YD
250.00
Subcontract
18.000
4,725.00
5,717.25
Assembly 136: Finishes =
5,717.25
Loc. 15: PLASTERING
Loc. 16: DRYWALL
Assembly  136: Finishes
Your tag line or anything or nothing here
Estimated By
Your Phone
Your Email
EasyEst Estimating Software
By CSC Software
Any City, CA 99999
Page 2 of 2
05/14/2019
2:04 PM
Bid 25: Res. PB Sample for report
Bid Items Ord. Qty by Loc/Assembly Report
Item
Code
Description
Unit
Quantity
Total
Cost
Order Qty.
Cost Type
Description
Unit
Raw
Unit Cost
Loc. 16: DRYWALL
Assembly  136: Finishes
 9.010700
1/2Drywall  8'H Intwall
175.00
LF
SF
1,400.00
Subcontract
0.550
808.50
978.29
Assembly 136: Finishes =
978.29
Loc. 16: DRYWALL
Loc. 17: WINDOWS‑SLIDING DOOR
Assembly  136: Finishes
 8.001700
Door‑Ext 3‑0X6‑8 Df 4Pan
1.00
EA
EA
HR
1.00
2.50
Material
Labor
250.000
20.000
337.50
 8.010500
Door 2‑6 Pre‑Fit H/C
3.00
HB
1
HR
3.00
3.00
Material
Labor
75.000
20.000
324.75
 8.034300
Door‑Fold  6‑0X8‑0    Hb
2.00
EA
EA
HR
2.00
3.00
Material
Labor
180.000
20.000
469.20
1,369.06
Assembly 136: Finishes =
1,369.06
Loc. 17: WINDOWS‑SLIDING DOOR
Loc. 31: INSULATION
Assembly  80: Insulation
 7.023400
R‑19 Walls
2,500.00
SF
SF
2,500.00
Subcontract
0.350
918.75
 7.023700
R‑19 Ceil. Batts
1,500.00
SF
SF
1,500.00
Subcontract
0.350
551.25
1,778.70
Assembly 80: Insulation =
1,778.70
Loc. 31: INSULATION
48,161.04
Total of Shown Bid Items *ONLY*   =